Skip to main content

Keating File 1, 1960-06-01 - 1966-09-14

 File — Box: 35, Folder: K1
Identifier: 1980-008-K1

Scope and Contents

Helpful Information on how to Prepare Conduct Report. 1963 State Highway Construction Contracts Awarded and Programmed. Correspondence about Highway 60. Correspondence about the construction of US 75. Correspondence about the Okmulgee Bee Line. State Highway Commission Rules, Regulations, and Policies as of January 11, 1966 (35 Pages). A copy of the schedule submitted to the State Highway Department by the Tulsa Division of the Corps of Engineers, covering highways affected by the planned Copan Reservoir. A Map of the Road System in the Port of Catoosa. A schedule for the reconstruction of US 75 in Washington County from Dewey north to the Kansas State line. A Summary of Programming for 1966 Fiscal Year. A copy of the Revised Fiscal Year 1966 Summary.

Dates

  • Creation: 1960-06-01 - 1966-09-14

Extent

1 folder : 226 Pages. ; 32 cm.

Language of Materials

From the Collection: English

Physical Description

Some adhesice damage.

General

Keating name on folder.

Repository Details

Part of the The University of Tulsa, McFarlin Library, Department of Special Collections & University Archives Repository

Contact:
McFarlin Library
University of Tulsa
2933 E. 6th St
Tulsa 74104-3123 USA
(918) 631-2496